Skip to main content
Warehouse Design Consultants

UAE Warehouse Design & Engineering

Complete architectural, MEP, and structural design for industrial logistics warehouses, cold storage facilities, commercial storage, and mixed-use light industrial units — across all UAE free zones and municipal areas.

Architectural Drawings
Industrial MEP Design
Structural Engineering
Free Zone & Municipality Permits
Cold Chain Compliance

37+

UAE Industrial Zones

AED 50K

Starting Cost

Why Choose Optimal

Warehouse Engineering That Understands UAE Free Zones

UAE industrial permitting is more complex than most markets. KEZAD, RAKEZ, SAIF Zone, HFZA, and FFZA each have distinct NOC requirements, structural approval chains, and authority-specific documentation standards. A drawing package accepted in one free zone may be rejected in another. Optimal has navigated all of these approval processes and knows what each authority expects before you submit.

Our technical depth goes beyond permit compliance. We handle portal frame design, floor slab specifications for forklift loads of 5–8 tonnes per square metre, dock leveller integration, MEP coordination for 3-phase industrial supply, and cold chain PIR panel systems. Every element is engineered to function under real operational loads — not just to satisfy a checklist.

The outcome is permits approved first time and construction-ready documentation with no rework. Our two completed UAE warehouse projects — a logistics warehouse in Jebel Ali and a commercial storage facility in Al Quoz — demonstrate the same approach: designed once, permitted once, built without change orders.

Facility Types

Four Warehouse Types We Design

Each type has distinct structural, MEP, and permitting requirements — our team works across all four.

Click a card for details

Industrial & Logistics Warehouse
#1

Industrial & Logistics Warehouse

Key Features

  • High-bay clear height (12–16 m)
  • Dock levelling systems
  • Heavy-duty floor slab (5–8 t/sqm)
  • MEP rated for industrial loads

Ideal For

Logistics operators and manufacturers needing UAE free zone and mainland industrial permits

Commercial Storage Facility
#2

Commercial Storage Facility

Key Features

  • Climate-controlled storage zones
  • Mezzanine storage options
  • Sprinkler systems (NFPA 13)
  • Flexible bay widths

Ideal For

Trading companies and retailers requiring DM or municipal storage permits across UAE

Cold Storage & Food Facility
#3

Cold Storage & Food Facility

Key Features

  • Insulated sandwich panel walls (150 mm PIR)
  • Blast freezer rooms (−25 °C)
  • Separate loading docks per temperature zone
  • Food safety and HACCP-aligned design

Ideal For

Food importers, HORECA suppliers, and pharmaceutical cold-chain operators

Mixed-Use Light Industrial

Mixed-Use Light Industrial

Key Features

  • Split office-to-warehouse ratio (15–30% office)
  • Glazed showroom frontage
  • 3-phase power supply
  • Mezzanine office option

Ideal For

SMEs and trading companies wanting showroom plus storage under one permit

Our Process

How We Deliver Your Warehouse Design

A structured five-stage process from initial brief to construction supervision — authority approval at every stage.

1

Site & Brief Assessment

Plot survey, utility connection point identification, and authority pre-application check to confirm permissibility, plot ratio, and setback requirements before any design work begins.

2

Scheme Design & Authority Pre-Approval

Concept layouts, portal frame sizing, dock configuration, and authority NOC pre-submission. Early authority engagement prevents redesign at permit stage.

3

Detailed Design Package

Architectural drawings, MEP drawings, structural calculations, civil works, and fire suppression design to NFPA 13 and UAE Civil Defence requirements. All disciplines coordinated in a single package.

4

Permit Submission & Authority Approval

Full permit submission to the relevant authority — KEZAD, municipality, free zone — with active management of authority comments and resubmissions until permit is issued.

5

Construction Supervision

Periodic site inspection visits, contractor coordination, milestone sign-offs against the approved drawings, and snag list resolution at practical completion.

Best Value

Transparent Pricing

Starting from AED 50,000

+ monthly supervision fees during construction phase

Full-Scope Warehouse Design Package

Architectural drawings (floor plans, elevations, sections)

MEP systems design (electrical, plumbing, HVAC)

Structural design and calculations

Civil and drainage design

Fire suppression design (NFPA 13 / Civil Defence)

Authority permit submission and follow-up

Construction-phase supervision visits

Common Questions

Warehouse Design FAQ

Answers to the questions we hear most often from UAE industrial clients.

How long does warehouse design take in a UAE free zone?

The typical timeline from brief to permit is 4–6 months. KEZAD and RAKEZ have distinct approval chains that add 2–4 weeks compared to municipal permits. Our structured process — pre-application check, scheme design, detailed package, permit submission — is calibrated to each authority's requirements to avoid resubmissions.

What is the cost of designing a warehouse in the UAE?

Standard commercial storage facilities under 2,000 sqm start from AED 50,000. Cold storage facilities and large logistics hubs of 5,000 sqm and above start from AED 120,000. Free zone projects carry a complexity premium due to authority-specific documentation requirements. All fees are quoted after a brief review of your site location, GFA, and facility type.

Do you design cold storage and food warehouses?

Yes. Our cold storage designs include insulated sandwich panel walls (150mm PIR minimum), blast freezer rooms down to −25°C, HACCP-aligned layouts, and compliance with Abu Dhabi Food Control Authority and Dubai Food Safety requirements. We coordinate cold chain MEP — refrigeration plant sizing, glycol pipework, and monitoring systems — as part of the full design package.

Which UAE free zones do you work in?

We work in KEZAD/KIZAD, RAKEZ, SAIF Zone, HFZA, FFZA, UAQ FTZ, Ajman Free Zone, and all municipal industrial areas across the UAE. We are not limited to this list — if your site is in a UAE industrial zone, we can confirm coverage after reviewing the authority's design submission requirements.

Can you handle KEZAD structural approval?

Yes. KEZAD requires structural calculations stamped by a registered UAE engineer and a geotechnical report as part of the building permit application. We manage the full KEZAD building permit process including the structural NOC, authority comments, and resubmissions until the permit is issued.

What structural system is used for warehouse design in UAE?

Most UAE warehouses use portal frame steel structures with concrete tilt-up or masonry infill walls. Column-free clear spans of 20–40 metres are standard for logistics operations. Floor slabs are designed for 5–8 tonnes per square metre depending on the racking system and forklift type. We size all structural elements to actual operational loads, not minimum code requirements.

Do you provide MEP design for warehouses?

Yes. Our full MEP scope includes 3-phase HV/LV electrical supply coordination with FEWA, SEWA, ADDC, or AADC depending on the emirate, industrial ventilation design, plumbing and drainage, and fire suppression coordination with Civil Defence. All MEP disciplines are included in the full-scope warehouse design package.

Can you expand an existing warehouse in UAE?

Yes. Warehouse additions and extensions require a new NOC and a structural assessment of the existing building. We assess the existing structural capacity, design the extension to match or upgrade the original specification, and manage the permit amendment with the relevant authority. The process typically takes 8–14 weeks depending on the authority.

Get Started

Ready to Design Your UAE Warehouse?

Tell us your site location, GFA requirement, and facility type. We will confirm the relevant authority requirements and provide a fee proposal within 48 hours.