Building Quality and Safety Certificate in Dubai

Under Dubai Law No. 3 of 2026, every building needs a Building Quality and Safety Certificate once 20 years have passed since its completion certificate. We inspect the building, write the technical report, supervise the repairs and apply for the certificate for owners and owners associations.

Check your building

Shown on the building’s completion certificate.

How tall is the building?
Who owns it?
Have you received a Dubai Municipality notice?

Your building

Enter the year to see when the certificate applies, how long it will be valid and what to do next.

Based on Law No. 3 of 2026, Articles 9, 10 and 13, and Dubai Municipality’s circular. Where no completion certificate was issued, the authority sets the start date.

How to get a Building Quality and Safety Certificate

Five parties pass the file between them against legal deadlines. The steps follow Article 8 of the law and Dubai Municipality’s circular. Pick your role to see only your part.

Show the steps for
  1. 1

    Step 1: Notice

    Owner
    Receives the notice and its deadline
    Dubai Municipality
    Sends notices in phases, oldest multi-storey buildings first
  2. 2

    Step 2: Appointment

    Owner
    Appoints an engineering firm classed for the building’s height
    Optimal
    Confirms our classification fits and opens the application on the Dubai Building platform
    Dubai Municipality
    Gives initial approval to start the assessment

    Up to 6 months from initial approval to the report (extendable to 2 years) Art. 8(2)

  3. 3

    Step 3: Inspection

    Owner
    Gives access to common areas, roof and plant rooms
    Optimal
    Inspects against the DM checklist; an accredited lab runs the tests
    Occupants
    Allow access to their units when asked
  4. 4

    Step 4: Technical report

    Owner
    Agrees the repair plan and timeframe
    Optimal
    Files the report: defects, repair methods, materials and timeframe
    Dubai Municipality
    Reviews the report and issues the remediation permit

    3 months for occupants to vacate, if required Art. 12(b)(3)

  5. 5

    Step 5: Repairs

    Owner
    Hires the contractor
    Optimal
    Supervises the work on site
    Contractor
    Repairs within the approved timeframe
    Occupants
    Vacate if the approved report requires it
  6. 6

    Step 6: Certificate

    Owner
    Renews every 10 or 5 years
    Optimal
    Confirms every defect is closed and applies for the certificate
    Dubai Municipality
    Inspects the building and issues the certificate

    Renew in the last 90 days DM

No defects found? The consultant applies for the certificate straight after the inspection, and the report and repair steps fall away.

What does the inspection check?

The technical report has to address every item on Dubai Municipality’s checklist, and in particular these six, set out in Article 7(d) of the law.

Front elevationIllustrativeABCD±0.00+4.50+23.70236451
Illustrative elevation of a typical older mid-rise. Hover or select an item to see where it is checked.

Dubai Municipality reviews and updates the checklist and publishes changes on the digital platform (Article 7(e)), so we work from the current version on each building.

Validity, deadlines and fines

The numbers that set your timetable, as written in the law. Where news reports and other guides disagree, this table follows the law and Dubai Municipality’s own announcement.

RuleWhat the law sets
Validity, building under 40 years10 years, renewableArt. 13
Validity, building 40 years or older5 years, renewableArt. 13
Renewal windowThe last 90 days before expiryDM, Oct 2026
Technical reportWithin 6 months of initial approval, extendable up to 2 years if there is no riskArt. 8(2)
Occupants vacate, if repairs require itWithin 3 months of the report’s approval, with priority to return at the same rentArts. 12, 15
FinesAED 100 to 1,000,000; doubled for a repeat within 2 years, up to AED 2,000,000Art. 16
Other measuresSuspension of building permits and of lease attestation for the buildingArt. 16(c)
Demolition insteadExemption with up to 1 year to demolish and a refundable AED 50,000 depositArt. 14

Law No. 3 of 2026 was issued on 27 February 2026. The Arabic text prevails. Fees and the list of violations are set by Executive Council resolution.

What to send us

With these we can confirm the scope, the classification needed for your building’s height and a fee proposal, usually from one message.

  1. 1The Dubai Municipality notice, if you have one
  2. 2The completion certificate
  3. 3The title deed or affection plan
  4. 4As-built drawings and maintenance records, if available

Questions owners ask

Who can carry out the assessment?

An engineering firm registered with Dubai Municipality whose classification matches the building’s height (Article 7). The firm must write the report itself, and any lab tests must be done by a Dubai-licensed laboratory accredited by the Emirates International Accreditation Centre.

How much does the certificate cost?

There are three parts: the authority’s fee, set by Executive Council resolution; the consultant’s fee, which depends on the building’s height, size and the tests needed; and the cost of any repairs. We quote our fee after seeing the notice and the completion certificate.

Are any buildings exempt?

The law applies across Dubai, including free zones and special development zones such as DIFC. Only the Chairman of the Executive Council can exempt a specific building. An owner who chooses to demolish, or a building the authority orders demolished, does not need the certificate (Articles 3 and 14).

What if the inspection finds no defects?

The consultant applies for the certificate straight after the inspection, through the e-service on the Dubai Building platform. Dubai Municipality then inspects the building and issues the certificate.

Is this the same as a building completion certificate?

No. The completion certificate is issued once, when construction finishes. The Quality and Safety Certificate is issued 20 years later, after an inspection of the existing building, and has to be renewed every 10 or 5 years.