عن DIP — Dubai Investment Park

تصميم المستودعات في DIP — Dubai Investment Park

Dubai Investment Park (DIP) is a master-planned mixed-use zone located approximately 25 kilometres southwest of Dubai city centre, developed along the Emirates Road (E611) logistics corridor between Sheikh Mohammed Bin Zayed Road (E311) and the Al Maktoum International Airport precinct at Dubai South. DIP spans approximately 2,300 hectares and is administered by Dubai Investment Park Management Company (DIPM) as the master developer, operating under the broader regulatory umbrella of the Dubai Development Authority (DDA). The zone accommodates a deliberate gradient of land uses — from light residential and commercial at the northern edge to medium and heavy industrial warehousing in the designated industrial precincts — making it one of the most diverse land-use clusters in Dubai's real estate portfolio.

DIP — Dubai Investment Park

تصميم وهندسة المستودعات

Warehouse building permits in DIP follow a dual-authority process. The primary structural permit is submitted to Dubai Municipality's Building Permits Department (DM BPD) through the Ejari-integrated Dubai REST or Municipalities portal, covering architectural, structural, and MEP drawings stamped by licensed Dubai engineering firms. Alongside this, DIP management approval from DIPM is required for the proposed building scheme, confirming that the proposed use, GFA, and building configuration comply with DIP's master plan zoning for the specific plot. DIPM's technical review focuses on site coverage ratios — typically a maximum plot coverage of 60% for industrial plots — setback requirements from plot boundaries (typically 3 metres minimum from secondary roads, 6 metres from main zone roads), and loading bay configuration relative to the traffic circulation plan for the industrial precinct. Building height restrictions in DIP's industrial precincts generally permit up to 15 metres eaves height for warehouse structures, though taller facilities may be accommodated subject to Aerodrome Obstacle Assessment from DCAA given proximity to Al Maktoum International Airport's controlled airspace.

Structural engineering in DIP warehouses serves a diverse occupier base ranging from light assembly operations to medium-density logistics. Portal frame spans of 15–24 metres cover the majority of DIP warehouse types, with eaves heights of 6–10 metres reflecting the zone's medium-bay logistics profile rather than the hyperscale racking heights common in JAFZA. Concrete floor slabs in DIP warehouses are designed to TR34 FM2 standard for general logistics and to FM3 for light industrial tenants with narrower forklift specifications, with slab thickness typically 150–200 mm on a compacted granular sub-base. DIP's subsoil is sandy desert fill with generally acceptable bearing capacity in the 150–200 kN/m² range for shallow pad foundations on lightly loaded portal frame column bases, though ground investigation reports confirming founding stratum depth are still required as part of the DM BPD submission package.

DEWA (Dubai Electricity and Water Authority) serves all plots within DIP, with power supply routed from DEWA's zone distribution substations to individual plot service entry points. DIP's plot infrastructure includes pre-installed DEWA cable route conduits in service corridors, simplifying connection applications for warehouse developments. Standard low-voltage supply is available for warehouses below approximately 500 kVA connected load; above this threshold a medium-voltage connection from DEWA's 11 kV network with a tenant-owned transformer room is typically required. Fire suppression systems in DIP warehouses must comply with UAE Fire and Life Safety Code (Ministry of Interior) and DCDFIRA approval, with NFPA 13 as the reference standard for commodity-classified rack storage. DIP's direct road connectivity to Sheikh Mohammed Bin Zayed Road (E311) and Emirates Road (E611), combined with the 12-kilometre drive to Dubai South's logistics corridor, make it an accessible mid-market warehousing option for distributors requiring both Dubai city access and southward connectivity toward Jebel Ali and Abu Dhabi. MEP coordination in DIP warehouse projects typically involves specifying evaporative pre-cooling for fresh air handling units to reduce mechanical cooling loads, a cost-effective measure in DIP's inland desert microclimate where summer ambient temperatures regularly exceed 45 degrees Celsius and evaporative cooling efficiency is high relative to coastal humid zones.

الجهة التنظيمية والتصاريح

تصاريح البناء وشهادة عدم الممانعة

Dubai Investment Park Management (DIPM) / Dubai Development Authority (DDA)

www.dip.ae

تستلزم جميع مشاريع إنشاء المستودعات في DIP — Dubai Investment Park الحصول على تصريح بناء وشهادة عدم ممانعة من Dubai Investment Park Management (DIPM) / Dubai Development Authority (DDA). يتولى فريقنا التقديم الكامل — الرسومات الإنشائية وحزمة الأنظمة الميكانيكية والكهربائية والتنسيق مع الدفاع المدني — لاستخراج تصريحك دون تأخير.

تشمل عملية الاعتماد مراجعة إنشائية وامتثالاً للأنظمة الميكانيكية والكهربائية وموافقة الدفاع المدني على أنظمة إطفاء الحرائق. تستلزم مشاريع المناطق الحرة مرحلة إضافية للحصول على شهادة عدم الممانعة من الجهة. ندير جميع المسارات بالتوازي لتقليص جدولك الزمني.

المرافق والبنية التحتية

توصيل الطاقة في DIP — Dubai Investment Park

تُدار توصيلات الطاقة الصناعية في DIP — Dubai Investment Park عبر DEWA. تستوجب مشاريع المستودعات التي تتجاوز 5,000 م² عادةً تقييم التغذية بالجهد العالي وتقديم طلب نقطة دخول الخدمة قبل بدء البناء.

منهجيتنا

كيف نُنجز تصميم مستودعك

منهجية منظمة من خمس مراحل من الإيجاز الأولي حتى الإشراف على البناء — اعتماد الجهة المختصة في كل مرحلة.

1

تقييم الموقع والمتطلبات

مسح الأرض، وتحديد نقاط توصيل المرافق، والتحقق المسبق مع الجهة المختصة لتأكيد مشروعية الاستخدام ونسبة البناء ومتطلبات الإخلاء قبل بدء أي تصميم.

2

التصميم المبدئي والموافقة المسبقة

مخططات المفهوم، وتحديد أبعاد الإطار الهيكلي، وتكوين الأرصفة، وتقديم شهادة عدم الممانعة المسبقة. التعامل المبكر مع الجهة المختصة يمنع إعادة التصميم في مرحلة التصريح.

3

حزمة التصميم التفصيلي

الرسومات المعمارية والرسومات الميكانيكية والكهربائية والحسابات الإنشائية والأعمال المدنية وتصميم أنظمة إطفاء الحرائق وفق NFPA 13 ومتطلبات الدفاع المدني الإماراتي. جميع التخصصات منسقة في حزمة واحدة.

4

تقديم التصريح واعتماد الجهة المختصة

تقديم التصريح الكامل إلى الجهة المختصة — كيزاد أو البلدية أو المنطقة الحرة — مع إدارة فعّالة لملاحظات الجهة وإعادة التقديم حتى صدور التصريح.

5

الإشراف على البناء

زيارات تفتيش دورية للموقع، وتنسيق مع المقاول، وتوقيع إنجاز المراحل وفق الرسومات المعتمدة، وحل قائمة الملاحظات عند الاكتمال الفعلي.

أفضل قيمة

تسعير شفاف

يبدأ من 50,000 درهم إماراتي

+ رسوم إشراف شهرية خلال مرحلة البناء

حزمة تصميم المستودع الشاملة

الرسومات المعمارية (مسقط أفقي، واجهات، قطاعات)

تصميم الأنظمة الميكانيكية والكهربائية والصحية

التصميم الإنشائي والحسابات

التصميم المدني وتصريف المياه

تصميم أنظمة إطفاء الحرائق (NFPA 13 / الدفاع المدني)

تقديم تصريح الجهة المختصة ومتابعته

هل أنت مستعد لتصميم مستودعك في DIP — Dubai Investment Park؟

هندسة إنشائية وميكانيكية وكهربائية وأنظمة إطفاء الحرائق وتصاريح الجهة المختصة — فريق واحد وسعر واحد ونقطة تواصل واحدة.